[1]
“ANALYSIS OF PHOTOVOLTAIC ENERGY PRODUCTION AS AN ELECTRIC CAR CHARGING INFRASTRUCTURE AT THE MUARO JAMBI DPRD OFFICE”, JTV, vol. 3, no. 1, pp. 49–56, Jan. 2025, doi: 10.21063/jtv.2025.3.1.49-56.